top of page
Fuel Containment Dike Redesign

Fuel Containment Dike

Our customer was tasked with replacing two large fuel containment dikes that were rusted and no longer compliant.

 

We designed the new containment structure using our CAD software and matched existing pipe connection locations, allowing for a smooth replacement.

 

We also sealed these drawings with our PE stamp for local code compliance. 

Fuel Containment Dike Redesign Drawing
bottom of page